[1]
Тарадаха, П.В., Недоступ, Л.А. and Надобко, О.В. 2013. The modified process optimization method the quality assurance of REE at a manufacturing stage. Visnyk NTUU KPI Seriia - Radiotekhnika Radioaparatobuduvannia. 54 (Nov. 2013), 75-81. DOI:https://doi.org/10.20535/RADAP.2013.54.75-81.